Nick, Kevin, and Joe can finish a certain piece of work in 10, 47, and 24 days, respectively. All three of them started the work together. Nick left the work after 2 days and Kevin left just 5 days before the work was completed. Find the total number of days taken for the work to be completed.

Answer & explanation

Show the answer

Correct answer: B — 14.4

Let total work be LCM(10, 47, 24). Wait, 10, 47, 24: LCM = 2820. Let's use 1 unit per day rates: Nick's rate 1/101/10, Kevin's rate 1/471/47, Joe's rate 1/241/24. Let total days be TT. Nick worked for 2 days, so work done by Nick = 2×110=152 \times \frac{1}{10} = \frac{1}{5}. Kevin left 5 days before completion, meaning Kevin worked for T−5T - 5 days. Joe worked for the entire duration TT. Equation: 210+T−547+T24=1\frac{2}{10} + \frac{T - 5}{47} + \frac{T}{24} = 1. Let's test option B (T=14.4T = 14.4): 15+9.447+14.424=0.2+0.2+0.6=1.0\frac{1}{5} + \frac{9.4}{47} + \frac{14.4}{24} = 0.2 + 0.2 + 0.6 = 1.0. This perfectly satisfies the equation! Thus, the total time is 14.4 days.

From the RRB Group D 5 Dec 2025 Shift 2 paper

This is question 44 of the RRB Group D 5 Dec 2025 Shift 2 question paper (Mathematics, Arithmetic).

More Arithmetic questions

All RRB Group D Arithmetic questions