Q.481
3 Dec 2025 Shift 2Show answer without attempting
Answer: D — 36
Train length = . Platform length = . Total distance = . Time = . Speed = . In km/hr: . Interpreting correctly yields 36.
RRB Group D · Mathematics · 742 questions
742 Arithmetic questions asked in RRB Group D previous year papers, each with the correct answer and an explanation. Part of Mathematics. Pick an option on any question to practise it.
Page 25 of 38 · Q481–500
Answer: D — 36
Train length = . Platform length = . Total distance = . Time = . Speed = . In km/hr: . Interpreting correctly yields 36.
Answer: B — 1,767
Ratio of investments = . Profits are shared in the ratio of investments. Dev's share = . Thus, .
Answer: D — 48 minutes
Let usual speed be and usual time be . Distance . New speed = , so new time = . Given .
Answer: C — 4
Total man-days required = man-days. To complete the work in 1 day, the number of men required is .
Answer: C — 3185
Ratio of Red : Blue = . Ratio of Blue : Yellow = . Make Blue common (LCM of 5 and 2 is 10): Red : Blue : Yellow = . Total ratio parts = . Yellow blocks = .
Answer: C — 46
Total age of 31 students = years. Total age of 31 students + teacher (32 people) = years. Age of the teacher = years.
Answer: C — 4
Rates of A, B, and C are , , and per day. Combined rate = of the work per day. To complete thrice the work ( units), time taken = days.
Answer: A — Increase by 16.8%
Let TV cost be , so washing machine cost is . Total initial cost for 6 washing machines and 2 TVs = . New washing machine cost = , 6 machines = . New TV cost = , 2 TVs = . New total cost = . Percentage change = .
Answer: A — 43.6
Initial sum of 35 scores = . Errors: two 25s were recorded as 33 (difference of each ), and one 36 was recorded as 34 (difference of ). Net correction = . Correct sum = . Correct average = .
Answer: A —
Numerator: 2.5 / 0.625 + 0.75 × (2/3) - 5/6 = 4 + 0.5 - 5/6 = 4.5 - 5/6 = 27/6 - 5/6 = 22/6 = 11/3. Denominator: (15-6)² / 9 + 0.5 = 81 / 9 + 0.5 = 9 + 0.5 = 9.5 = 19/2. Entire expression = (11/3) / (19/2) = (11 × 2) / (3 × 19) = 22/57.
Answer: D — 1
The numbers between 480 and 489 are 481, 482, 483, 484, 485, 486, 487, and 488. Checking for primality: 487 is a prime number, while all others are composite (e.g., 481 = 13 × 37, 482 = 2 × 241, 483 = 3 × 161, etc.). Hence, there is only 1 prime number.
Answer: D —
Given A : B = 4 : 6 = 14 : 21 (multiplying by 3.5) and B : C = 7 : 12 = 21 : 36 (multiplying by 3). Therefore, combining them gives A : B : C = 14 : 21 : 36.
Answer: B — 568
Marked Price (MP) = ₹896, Discount = 29%. Selling Price (SP) = MP × (1 - 0.29) = 896 × 0.71 = ₹636.16. Profit = 12%, so SP = CP × 1.12. Cost Price (CP) = 636.16 / 1.12 = ₹568.
Answer: D — 75.3
Total students = 91. 12 students average 64 ⇒ sum = 12 × 64 = 768. Remaining students = 91 - 12 = 79, with average 77 ⇒ sum = 79 × 77 = 6083. Total sum = 768 + 6083 = 6851. Overall average = 6851 / 91 ≈ 75.285..., which rounds to 75.3.
Answer: D — 757 m
Speed of the train v = (2091 - 1259)/(89 - 63) = 832/26 = 32 m/s. Length of train = (v × time) - tunnel length = (32 × 63) - 1259 = 2016 - 1259 = 757 m.