Time & Work questions

Q.1

19 Dec 2025 Shift 1
A cistern has two inlet pipes, A and B, and one outlet pipe, C. Pipe A can fill the cistern alone in 15 hours, pipe B in 18 hours, and pipe C can empty it in 27 hours. For the first 5 hours, pipes A and B are opened together. Then, for the next 12 hours, pipes B and C are opened together. After that, only pipe B works. How long will pipe B alone take to fill the remaining part of the cistern?
Show answer without attempting

Answer: C — 3 hours

Let total work (capacity) be LCM of 15, 18, and 27, which is 270 units. Rates: A = +18+18 units/hr, B = +15+15 units/hr, C = −10-10 units/hr. For the first 5 hours, A and B work together: work done = 5×(18+15)=5×33=1655 \times (18 + 15) = 5 \times 33 = 165 units. For the next 12 hours, B and C work together: work done = 12×(15−10)=12×5=6012 \times (15 - 10) = 12 \times 5 = 60 units. Total work done so far = 165+60=225165 + 60 = 225 units. Remaining work = 270−225=45270 - 225 = 45 units. Time taken by B alone to finish remaining work = 45Rate of B=4515=3\frac{45}{\text{Rate of B}} = \frac{45}{15} = 3 hours.

Open question page

Q.2

19 Dec 2025 Shift 1
P and Q together can fill a cistern with water in 12 hours. If P alone can fill the cistern with water in 24 hours, then in how many hours will Q alone fill one-fourth of the same cistern with water?
Show answer without attempting

Answer: A — 6

Given that (P+Q)(P + Q)'s 1 hour work = 112\frac{1}{12}, and PP's 1 hour work = 124\frac{1}{24}. Q's 1 hour work = 112−124=124\frac{1}{12} - \frac{1}{24} = \frac{1}{24}. Thus, Q alone can fill the entire cistern in 24 hours. The time required for Q to fill one-fourth of the cistern is 14×24=6\frac{1}{4} \times 24 = 6 hours.

Open question page

Q.3

17 Dec 2025 Shift 1
Mahi would need twice as much time as Neha and Asha combined, while Asha would require three times as much time as Neha and Mahi combined to complete a certain task. If all three friends work together, they can finish the task in 20 days. How many days would Neha take to complete the same task on her own?
Show answer without attempting

Answer: D — 48 days

Let 1-day work of Neha, Mahi, and Asha be N,M,AN, M, A. Given M=12(N+A)M = \frac{1}{2}(N + A) and A=13(N+M)A = \frac{1}{3}(N + M). Combined 1-day work 120=N+M+A\frac{1}{20} = N + M + A. Solving the simultaneous equations yields Neha's individual rate N=148N = \frac{1}{48}, meaning she takes 48 days.

Open question page

Q.4

14 Dec 2025 Shift 1
In a presentation competition, group Leo can complete a task in 9 days, while group Tiger can complete it in 18 days. If both groups work together, in how many days will they complete the work?
Show answer without attempting

Answer: B — 6 days

Group Leo's 1-day work = 1/9, Group Tiger's 1-day work = 1/18. Combined 1-day work = 1/9 + 1/18 = 3/18 = 1/6. Therefore, working together, they will complete the work in 6 days.

Open question page

Q.5

14 Dec 2025 Shift 1
4 men can do a piece of work in 27 days. How many men will do the same work in 18 days?
Show answer without attempting

Answer: A — 6

Using the inverse proportion formula M₁D₁ = M₂D₂, where M₁ = 4, D₁ = 27, and D₂ = 18. Therefore, M₂ = (4 × 27)/18 = 108/18 = 6 men.

Open question page

Q.6

14 Dec 2025 Shift 1
A, B and C can complete a piece of work in 3, 4 and 6 days respectively. Working together, how much time (in days) will they take to complete three times the same work?
Show answer without attempting

Answer: D — 4

1-day work of A, B, and C are 1/3, 1/4, and 1/6 respectively. Combined 1-day work = 1/3 + 1/4 + 1/6 = (4 + 3 + 2)/12 = 9/12 = 3/4 of the work per day. To complete 3 times the work, time taken = (3 units of work)/(3/4 work/day) = 4 days.

Open question page

Q.7

14 Dec 2025 Shift 2
A, B and C can do a piece of work in 2, 20 and 20 days respectively. How long (in days) will they take to do thrice the same work, working together?
Show answer without attempting

Answer: A — 5

Individual rates per day: A = 12\frac{1}{2}, B = 120\frac{1}{20}, C = 120\frac{1}{20}. Combined rate = 12+120+120=10+1+120=1220=35\frac{1}{2} + \frac{1}{20} + \frac{1}{20} = \frac{10 + 1 + 1}{20} = \frac{12}{20} = \frac{3}{5} of the work per day. To do 3 times the work, time = 335=5\frac{3}{\frac{3}{5}} = 5 days.

Open question page

Q.8

14 Dec 2025 Shift 2
5 men can complete a piece of work in 16 days while 9 women can do it in 8 days. In how many days can 3 women and 2 men complete it?
Show answer without attempting

Answer: D — 15 days

5 men in 16 days   ⟹  1\implies 1 man's 1 day work = 180\frac{1}{80}. 9 women in 8 days   ⟹  1\implies 1 woman's 1 day work = 172\frac{1}{72}. For 3 women and 2 men: 1 day work = 3×172+2×180=124+140=5+3120=8120=1153 \times \frac{1}{72} + 2 \times \frac{1}{80} = \frac{1}{24} + \frac{1}{40} = \frac{5+3}{120} = \frac{8}{120} = \frac{1}{15}. Thus, they complete the work in 15 days.

Open question page

Q.9

12 Dec 2025 Shift 1
A and B working together can do a piece of work in 6 days. B alone can do the same work in 14 days. How long (in days) will A alone take to do double the work?
Show answer without attempting

Answer: A — 21

Given (A+B)(A+B)'s 1 day work = 16\frac{1}{6} and BB's 1 day work = 114\frac{1}{14}. Therefore, AA's 1 day work = 16−114=7−342=442=221\frac{1}{6} - \frac{1}{14} = \frac{7 - 3}{42} = \frac{4}{42} = \frac{2}{21}. Time taken by A alone to do double the work (22 units) = 22/21=21\frac{2}{2/21} = 21 days.

Open question page

Q.10

12 Dec 2025 Shift 1
Pipe P can fill 25\frac{2}{5} part of a tank in 42 hours and pipe Q can fill 25\frac{2}{5} part of the same tank in 30 hours. Both P and Q were kept open for 5 hours, then both were closed. Pipe R alone was then opened and it emptied the water in the tank in 12 hours. Pipes P, Q and R together can fill the empty tank in:
Show answer without attempting

Answer: B — 75 hours

Pipe P fills the tank in 422/5=105\frac{42}{2/5} = 105 hours. Pipe Q fills the tank in 302/5=75\frac{30}{2/5} = 75 hours. In 5 hours, fraction filled by P and Q = 5×(1105+175)5 \times \left(\frac{1}{105} + \frac{1}{75}\right). Pipe R empties it in 12 hours. Solving the combined work rate yields a total filling time of 75 hours for P, Q, and R together.

Open question page

Q.11

12 Dec 2025 Shift 2
A, B and C can do a piece of work in 2, 6 and 3 days, respectively. How long (in days) will they take to do thrice the same work, working together?
Show answer without attempting

Answer: B — 3

A's 1-day work = 1/2, B's = 1/6, C's = 1/3. Combined 1-day work = 1/2 + 1/6 + 1/3 = (3 + 1 + 2)/6 = 6/6 = 1 work per day. Working together, they finish 1 work in 1 day. To do thrice the work (3 units), they will take 3 × 1 = 3 days.

Open question page

Q.12

12 Dec 2025 Shift 2
A camp has provisions for 55 persons for 14 days. In how many days will the same provisions finish off, if the strength of the camp is increased to 70 persons?
Show answer without attempting

Answer: B — 11

This is an inverse proportion problem based on man-days: P₁ × D₁ = P₂ × D₂. Substituting the values: 55 × 14 = 70 × D₂ ⇒ D₂ = (55 × 14)/70 = 55/5 = 11 days.

Open question page

Q.13

12 Dec 2025 Shift 3
One pipe can fill a tank in 2 minutes, while another pipe can empty the completely filled tank in 4 minutes. If both the pipes are opened together when the tank is empty, how many minutes will it take to fill one-fourth of the tank?
Show answer without attempting

Answer: C — 1

Rate of filling pipe = 12\frac{1}{2} tank/min, rate of emptying pipe = 14\frac{1}{4} tank/min. Net filling rate when both open = 12−14=14\frac{1}{2} - \frac{1}{4} = \frac{1}{4} tank/min. Time taken to fill 14\frac{1}{4} of the tank = 1/41/4=1 minute\frac{1/4}{1/4} = 1 \text{ minute}.

Open question page

Q.14

12 Dec 2025 Shift 3
Aditya can do 16\frac{1}{6}th of a piece of work in 5 days and Bhagawan can do 15\frac{1}{5}th of the same work in 11 days. Find the number of days taken to complete the work if both work together. (Rounded off to one decimal place)
Show answer without attempting

Answer: B — 19.4

Aditya completes 16\frac{1}{6}th work in 5 days, so total work takes 5×6=305 \times 6 = 30 days. Bhagawan completes 15\frac{1}{5}th in 11 days, taking 11×5=5511 \times 5 = 55 days. Combined 1-day work = 130+155=11+6330=17330\frac{1}{30} + \frac{1}{55} = \frac{11 + 6}{330} = \frac{17}{330}. Total days = 33017≈19.4\frac{330}{17} \approx 19.4 days.

Open question page

Q.15

11 Dec 2025 Shift 1
One pipe can fill a tank in 11 minutes, while a second pipe can empty the completely filled tank in 22 minutes. If both pipes are opened simultaneously when the tank is empty, how many minutes will it take to fill half of the tank?
Show answer without attempting

Answer: D — 11

Pipe 1 fills 1/11 of the tank per minute. Pipe 2 empties 1/22 of the tank per minute. Net filled per minute = 1/11 - 1/22 = 1/22 of the tank. To fill half the tank (1/2), time required = (1/2) / (1/22) = 11 minutes.

Open question page

Q.16

11 Dec 2025 Shift 1
X people were given a contract for doing a piece of work in 36 days. 3 people did not turn up to work due to sickness, and the rest of the people completed the work in 39 days. What is the value of X?
Show answer without attempting

Answer: C — 39

Total man-days remain constant: X × 36 = (X - 3) × 39 => 36X = 39X - 117 => 3X = 117 => X = 39.

Open question page

Q.17

11 Dec 2025 Shift 2
Two pumps, M and N, can fill a tank in 36 hours and 45 hours, respectively. Another pump, P, can empty the tank in 30 hours. First, M and N are opened, and after 8 hours, P is also opened. The tank will be filled in a total of T hours. Find the value of T.
Show answer without attempting

Answer: B — 44

Let total work = LCM(36, 45, 30) = 180 units. Rate of M = 180/36=5180/36 = 5 units/hr, rate of N = 180/45=4180/45 = 4 units/hr, rate of P = −180/30=−6-180/30 = -6 units/hr. M and N work for 8 hours alone: (5+4)×8=72(5+4) \times 8 = 72 units filled. Remaining work = 180−72=108180 - 72 = 108 units. Now all three work together with combined rate = 5+4−6=35 + 4 - 6 = 3 units/hr. Time taken for remaining work = 108/3=36108 / 3 = 36 hours. Total time T = 8+36=448 + 36 = 44 hours.

Open question page

Q.18

11 Dec 2025 Shift 2
A and B together can complete a piece of work in 2 days. B alone can complete the same work in 10 days. In how much time (in days) will A alone complete twice the same work?
Show answer without attempting

Answer: D — 5

A + B's 1-day work = 12\frac{1}{2}. B's 1-day work = 110\frac{1}{10}. A's 1-day work = 12−110=5−110=410=25\frac{1}{2} - \frac{1}{10} = \frac{5-1}{10} = \frac{4}{10} = \frac{2}{5}. Time taken by A to complete the work alone = 52=2.5\frac{5}{2} = 2.5 days. Therefore, time taken by A to complete double the work = 2×2.5=52 \times 2.5 = 5 days.

Open question page

Q.19

11 Dec 2025 Shift 3
11 men and 17 women can complete a work in 6 days, and 18 men and 15 women can complete the same work in 4 days. The work of how many women is equal to the work of one man?
Show answer without attempting

Answer: A — 7

Let the work done by 1 man in 1 day be MM and by 1 woman be WW. Total work = (11M+17W)×6=(18M+15W)×4(11M + 17W) \times 6 = (18M + 15W) \times 4. Simplifying: 66M+102W=72M+60W  ⟹  102W−60W=72M−66M  ⟹  42W=6M  ⟹  M=7W66M + 102W = 72M + 60W \implies 102W - 60W = 72M - 66M \implies 42W = 6M \implies M = 7W. Therefore, the work of 7 women is equal to the work of one man.

Open question page

Q.20

11 Dec 2025 Shift 3
A and B together can do a piece of work in 6 days. B alone can do the same work in 7 days. How much time (in days) will A alone take to do double the work?
Show answer without attempting

Answer: B — 84

Let total work be 1 unit. Combined 1-day work of A and B is 16\frac{1}{6}, and B's 1-day work is 17\frac{1}{7}. A's 1-day work = 16−17=142\frac{1}{6} - \frac{1}{7} = \frac{1}{42}. Time taken by A alone to do 1 unit of work is 42 days. Therefore, time taken by A to do double the work (22 units) is 2×42=842 \times 42 = 84 days.

Open question page

Related topics in Arithmetic

0/200 correct0 marks