Q.61
1 Dec 2025 Shift 2Show answer without attempting
Answer: B — 49.2
Aman's total time to complete work = days. Chaman's total time = days. Combined 1-day work = . Total days = days, which rounds off to 49.2.
RRB Group D · Arithmetic · 78 questions
78 Time & Work questions asked in RRB Group D previous year papers, each with the correct answer and an explanation. Part of Arithmetic. Pick an option on any question to practise it.
Page 4 of 4 · Q61–78
Answer: B — 49.2
Aman's total time to complete work = days. Chaman's total time = days. Combined 1-day work = . Total days = days, which rounds off to 49.2.
Answer: B — 2
Using the work formula (M_1 D_1)/W_1 = (M_2 D_2)/W_2. (3 × 4)/39 = (M_2 × 12)/78 ⇒ 12/39 = (12 M_2)/78 ⇒ M_2 = 12/39 × 78/12 = 2.
Answer: C — 1620
Using direct proportion: 40/2 = t/81 ⇒ 20 = t/81 ⇒ t = 20 × 81 = 1620 minutes.
Answer: A — 7
A + B's 1-day work = 1/3. B's 1-day work = 1/21. A's 1-day work = (1/3) - (1/21) = (7 - 1)/21 = 6/21 = 2/7. Time for A alone to do 1 work = 7/2 days. Therefore, time to do double the work = 2 × (7/2) = 7 days.
Answer: B — 48 days
Let total work be 120 units (LCM of 40 and 60). Navya's 1-day work = 3 units, Bhavya's = 2 units. Working on alternate days starting with Bhavya: Day 1: Bhavya (2 units), Day 2: Navya (3 units). In a 2-day cycle, 5 units are completed. To complete 120 units, 24 cycles are needed. Total days = 24 × 2 = 48 days.
Answer: C — 36
A + B's 1-day work = 1/6, B alone = 1/9. A alone = 1/6 - 1/9 = 1/18. So A alone takes 18 days to complete 1 work. To complete double the work, A takes 18 × 2 = 36 days.
Answer: D — 8
Using the inverse proportion formula: , where . Solving for , we get days.
Answer: D — 59 days
Let A's 1-day work = . B is 75% less efficient than A, so B's efficiency = . C is 40% more efficient than B, so C's efficiency = . Combined 1-day work of B and C = . In 30 days, work done by B and C = . Remaining work = . Time taken by A alone to finish remaining work = days.
Answer: C — 16
1-day work of A and B = . 1-day work of B alone = . 1-day work of A alone = . Time taken by A alone to do 1 unit of work = 8 days. Therefore, to do double the work (2 units), A takes days.
Answer: C — 7.4
Let total work = 420 units (LCM of 15, 14, 21). Rates: Paul = 28 units/day, Ryan = 30 units/day, Max = 20 units/day. Let total days be . Paul works for 5 days ( units). Ryan leaves 3 days before the end, so he works for days. Max works for all days. Total work equation: days.
Answer: B — 5
A, B, and C can complete the work in 3, 5, and 15 days respectively. Their 1-day work rates are , , and . Combined 1-day work = of the work per day. To complete 3 times the work, total time = days.
Answer: B — 6/13
Let the total capacity of the tank be 120 units (LCM of 40, 20, 30). Rates of pipes A, B, and C are 3, 6, and 4 units/minute, respectively. In 9 minutes, A fills , B fills , and C fills units. Total liquid in the tank = 27 + 54 + 36 = 117 units. The amount of solution Q (from pipe B) is 54 units. Proportion of Q = .
Answer: C — 24
Given (A + B)'s 1-day work = and B's 1-day work = . A's 1-day work = . Thus, A alone takes 12 days to complete 1 work. To complete double the work, A will take days.
Answer: A — 20
Let A's 1-day work be and B's be . Given and . Thus, . A takes 10 days to do 1 piece of work, so to do double the work ( units), A takes days.
Answer: A — 6
A's 1-day work = , B's = , C's = . Combined 1-day work = . Time taken for 1 work = 2 days. Time taken for thrice the work = days.
Answer: A — 30
Using inverse proportion (men days = constant): M_1 \times D_1 = M_2 \times D_2 \implies 3 \times 20 = M_2 \. 2 \implies 60 = 2M_2 \implies M_2 = 30 men.
0/180 correct0 marks