Q.61

1 Dec 2025 Shift 2
Aman can do 16\frac{1}{6}th of a piece of work in 13 days and Chaman can do 17\frac{1}{7}th of the same work in 19 days. Find the number of days taken to complete the work if both work together. (Rounded off to one decimal place)
Show answer without attempting

Answer: B — 49.2

Aman's total time to complete work = 13×6=7813 \times 6 = 78 days. Chaman's total time = 19×7=13319 \times 7 = 133 days. Combined 1-day work = 178+1133=133+7810374=21110374\frac{1}{78} + \frac{1}{133} = \frac{133 + 78}{10374} = \frac{211}{10374}. Total days = 10374211≈49.16\frac{10374}{211} \approx 49.16 days, which rounds off to 49.2.

Open question page

Q.62

1 Dec 2025 Shift 3
Three men can dig a well 39 feet deep in 4 days. How many men can dig a well 78 feet deep in 12 days?
Show answer without attempting

Answer: B — 2

Using the work formula (M_1 D_1)/W_1 = (M_2 D_2)/W_2. (3 × 4)/39 = (M_2 × 12)/78 ⇒ 12/39 = (12 M_2)/78 ⇒ M_2 = 12/39 × 78/12 = 2.

Open question page

Q.63

1 Dec 2025 Shift 3
A typist takes 40 minutes to type 2 pages. How long (in minutes) will he take to type 81 pages?
Show answer without attempting

Answer: C — 1620

Using direct proportion: 40/2 = t/81 ⇒ 20 = t/81 ⇒ t = 20 × 81 = 1620 minutes.

Open question page

Q.64

1 Dec 2025 Shift 3
A and B working together can do a piece of work in 3 days. B alone can do the same work in 21 days. How long (in days) will A alone take to do double the work?
Show answer without attempting

Answer: A — 7

A + B's 1-day work = 1/3. B's 1-day work = 1/21. A's 1-day work = (1/3) - (1/21) = (7 - 1)/21 = 6/21 = 2/7. Time for A alone to do 1 work = 7/2 days. Therefore, time to do double the work = 2 × (7/2) = 7 days.

Open question page

Q.65

28 Nov 2025 Shift 1
Navya and Bhavya can paint a house in 40 days and 60 days, respectively. If they work on alternate days, starting with Bhavya, in how many days can the duo complete painting that house?
Show answer without attempting

Answer: B — 48 days

Let total work be 120 units (LCM of 40 and 60). Navya's 1-day work = 3 units, Bhavya's = 2 units. Working on alternate days starting with Bhavya: Day 1: Bhavya (2 units), Day 2: Navya (3 units). In a 2-day cycle, 5 units are completed. To complete 120 units, 24 cycles are needed. Total days = 24 × 2 = 48 days.

Open question page

Q.66

28 Nov 2025 Shift 1
A and B working together can do a piece of work in 6 days. B alone can do the same work in 9 days. How long (in days) will A alone take to do double the work?
Show answer without attempting

Answer: C — 36

A + B's 1-day work = 1/6, B alone = 1/9. A alone = 1/6 - 1/9 = 1/18. So A alone takes 18 days to complete 1 work. To complete double the work, A takes 18 × 2 = 36 days.

Open question page

Q.67

28 Nov 2025 Shift 2
A camp has provisions for 48 persons for 12 days. In how many days will the same provisions finish off if the strength of the camp is increased to 72 persons?
Show answer without attempting

Answer: D — 8

Using the inverse proportion formula: P1×D1=P2×D2P_1 \times D_1 = P_2 \times D_2, where 48×12=72×D248 \times 12 = 72 \times D_2. Solving for D2D_2, we get D2=48×1272=57672=8D_2 = \frac{48 \times 12}{72} = \frac{576}{72} = 8 days.

Open question page

Q.68

28 Nov 2025 Shift 2
A can complete a piece of work in 77 days. B is 75% less efficient than A. C is 40% more efficient than B. If B and C work together for 30 days, A alone will complete the remaining work in:
Show answer without attempting

Answer: D — 59 days

Let A's 1-day work = 1/771/77. B is 75% less efficient than A, so B's efficiency = 0.25×(1/77)=1/3080.25 \times (1/77) = 1/308. C is 40% more efficient than B, so C's efficiency = 1.40×(1/308)=7/1540=1/2201.40 \times (1/308) = 7/1540 = 1/220. Combined 1-day work of B and C = 1308+1220=5+71540=121540=3385\frac{1}{308} + \frac{1}{220} = \frac{5+7}{1540} = \frac{12}{1540} = \frac{3}{385}. In 30 days, work done by B and C = 30×3385=90385=187730 \times \frac{3}{385} = \frac{90}{385} = \frac{18}{77}. Remaining work = 1−1877=59771 - \frac{18}{77} = \frac{59}{77}. Time taken by A alone to finish remaining work = 59/771/77=59\frac{59/77}{1/77} = 59 days.

Open question page

Q.69

28 Nov 2025 Shift 2
A and B working together can do a piece of work in 4 days. B alone can do the same work in 8 days. How long (in days) will A alone take to do double the work?
Show answer without attempting

Answer: C — 16

1-day work of A and B = 14\frac{1}{4}. 1-day work of B alone = 18\frac{1}{8}. 1-day work of A alone = 14−18=18\frac{1}{4} - \frac{1}{8} = \frac{1}{8}. Time taken by A alone to do 1 unit of work = 8 days. Therefore, to do double the work (2 units), A takes 8×2=168 \times 2 = 16 days.

Open question page

Q.70

28 Nov 2025 Shift 3
Paul, Ryan and Max can finish a certain piece of work in 15, 14 and 21 days, respectively. All three of them started the work together. Paul left the work after 5 days and Ryan left just 3 days before the work was completed. Find the total number of days taken for the work to be completed.
Show answer without attempting

Answer: C — 7.4

Let total work = 420 units (LCM of 15, 14, 21). Rates: Paul = 28 units/day, Ryan = 30 units/day, Max = 20 units/day. Let total days be xx. Paul works for 5 days (5×28=1405 \times 28 = 140 units). Ryan leaves 3 days before the end, so he works for (x−3)(x-3) days. Max works for all xx days. Total work equation: 140+30(x−3)+20x=420  ⟹  140+30x−90+20x=420  ⟹  50x+50=420  ⟹  50x=370  ⟹  x=7.4140 + 30(x-3) + 20x = 420 \implies 140 + 30x - 90 + 20x = 420 \implies 50x + 50 = 420 \implies 50x = 370 \implies x = 7.4 days.

Open question page

Q.71

28 Nov 2025 Shift 3
A, B and C can complete a piece of work in 3, 5 and 15 days, respectively. How long (in days) will they take to complete thrice the same work, working together?
Show answer without attempting

Answer: B — 5

A, B, and C can complete the work in 3, 5, and 15 days respectively. Their 1-day work rates are 13\frac{1}{3}, 15\frac{1}{5}, and 115\frac{1}{15}. Combined 1-day work = 13+15+115=5+3+115=915=35\frac{1}{3} + \frac{1}{5} + \frac{1}{15} = \frac{5 + 3 + 1}{15} = \frac{9}{15} = \frac{3}{5} of the work per day. To complete 3 times the work, total time = 335=3×53=5\frac{3}{\frac{3}{5}} = 3 \times \frac{5}{3} = 5 days.

Open question page

Q.72

28 Nov 2025 Shift 3
2 men can do a piece of work in 2 days. How many men will do it in 4 days?
Show answer without attempting

Answer: B — 1

Using the inverse proportion formula for men and days: M1×D1=M2×D2  ⟹  2 men×2 days=x men×4 days  ⟹  4=4x  ⟹  x=1M_1 \times D_1 = M_2 \times D_2 \implies 2 \text{ men} \times 2 \text{ days} = x \text{ men} \times 4 \text{ days} \implies 4 = 4x \implies x = 1 man.

Open question page

Q.73

27 Nov 2025 Shift 1
Three pipes, A, B and C, can fill a tank from empty to full in 40 minutes, 20 minutes and 30 minutes, respectively. When the tank is empty, all the three pipes are opened. A, B and C discharge chemical solutions P, Q and R, respectively. What is the proportion of solution Q in the liquid in the tank after 9 minutes?
Show answer without attempting

Answer: B — 6/13

Let the total capacity of the tank be 120 units (LCM of 40, 20, 30). Rates of pipes A, B, and C are 3, 6, and 4 units/minute, respectively. In 9 minutes, A fills 9×3=279 \times 3 = 27, B fills 9×6=549 \times 6 = 54, and C fills 9×4=369 \times 4 = 36 units. Total liquid in the tank = 27 + 54 + 36 = 117 units. The amount of solution Q (from pipe B) is 54 units. Proportion of Q = 54117=613\frac{54}{117} = \frac{6}{13}.

Open question page

Q.74

27 Nov 2025 Shift 1
A and B working together can do a piece of work in 6 days. B alone can do the same work in 12 days. How long (in days) will A alone take to do double the work?
Show answer without attempting

Answer: C — 24

Given (A + B)'s 1-day work = 16\frac{1}{6} and B's 1-day work = 112\frac{1}{12}. A's 1-day work = 16−112=112\frac{1}{6} - \frac{1}{12} = \frac{1}{12}. Thus, A alone takes 12 days to complete 1 work. To complete double the work, A will take 12×2=2412 \times 2 = 24 days.

Open question page

Q.75

27 Nov 2025 Shift 2
A and B working together can do a piece of work in 6 days. B alone can do the same work in 15 days. How long (in days) will A alone take to do double the work?
Show answer without attempting

Answer: A — 20

Let A's 1-day work be aa and B's be bb. Given a+b=16a + b = \frac{1}{6} and b=115b = \frac{1}{15}. Thus, a=16−115=5−230=330=110a = \frac{1}{6} - \frac{1}{15} = \frac{5 - 2}{30} = \frac{3}{30} = \frac{1}{10}. A takes 10 days to do 1 piece of work, so to do double the work (22 units), A takes 10×2=2010 \times 2 = 20 days.

Open question page

Q.76

27 Nov 2025 Shift 3
A, B and C can do a piece of work in 3, 8 and 24 days, respectively. How long (in days) will they take to do thrice the same work, working together?
Show answer without attempting

Answer: A — 6

A's 1-day work = 13\frac{1}{3}, B's = 18\frac{1}{8}, C's = 124\frac{1}{24}. Combined 1-day work = 13+18+124=8+3+124=1224=12\frac{1}{3} + \frac{1}{8} + \frac{1}{24} = \frac{8 + 3 + 1}{24} = \frac{12}{24} = \frac{1}{2}. Time taken for 1 work = 2 days. Time taken for thrice the work = 3×2=63 \times 2 = 6 days.

Open question page

Q.77

27 Nov 2025 Shift 3
3 men can do a piece of work in 20 days. How many men will do it in 2 days?
Show answer without attempting

Answer: A — 30

Using inverse proportion (men ×\times days = constant): M_1 \times D_1 = M_2 \times D_2 \implies 3 \times 20 = M_2 \. 2 \implies 60 = 2M_2 \implies M_2 = 30 men.

Open question page

Q.78

27 Nov 2025 Shift 3
11 men can dig a well 59 feet deep in 19 days. How many men can dig a well 118 feet deep in 2 days?
Show answer without attempting

Answer: A — 209

Using the chain rule formula M1D1W1=M2D2W2\frac{M_1 D_1}{W_1} = \frac{M_2 D_2}{W_2}: 11×1959=M2×2118\frac{11 \times 19}{59} = \frac{M_2 \times 2}{118}. Since 118/59=2118 / 59 = 2, this simplifies to 11×191=M2×1  ⟹  M2=11×19=209\frac{11 \times 19}{1} = M_2 \times 1 \implies M_2 = 11 \times 19 = 209.

Open question page

Related topics in Arithmetic

0/180 correct0 marks