Q.61

25 Jul 2023 Shift 1
4 men and 6 women can complete a work in 8 days, while 3 men and 7 women can complete it in 10 days. In how many days will 25 women complete it?
Show answer without attempting

Answer: B — 16

Open question page

Q.62

25 Jul 2023 Shift 1
A group of men decided to do a job in 13 days but 9 men left the work after each day. The work, as a result, got completed in 16 days. How many men were initially in the group?
Show answer without attempting

Answer: B — 360

Open question page

Q.63

25 Jul 2023 Shift 1
Raju and Rajat working together take 5 days to complete a piece of work. If Raju alone can do this work in 7 days, how long would Rajat take to complete the same work?
Show answer without attempting

Answer: D — 17.5 days

Open question page

Q.64

25 Jul 2023 Shift 2
P and Q together complete a job in 4254 \frac{2}{5} days. R and S complete the same job in 4894 \frac{8}{9} days. If P, Q, R and S work together, how many days do they need to complete the same job?
Show answer without attempting

Answer: D — 26192\frac{6}{19}

Open question page

Q.65

25 Jul 2023 Shift 2
A can finish a work in 60 days. He works at it for 15 days and then B alone finishes the remaining work in 48 days. In how much time can A and B working together finish the work?
Show answer without attempting

Answer: A — 96031\frac{960}{31} days

Open question page

Q.66

25 Jul 2023 Shift 2
A can complete 13\frac{1}{3} of a work in 7 days and B can complete 27\frac{2}{7} of the same work in 10 days. In how many days can both A and B together complete the work?
Show answer without attempting

Answer: C — 131813 \frac{1}{8}

Open question page

Q.67

25 Jul 2023 Shift 2
A can do 13\frac{1}{3} of a piece of work in 32 days, B can do 3712%37 \frac{1}{2}\% of the same work in 24 days, while C can do 60%60\% of the same work in 48 days. B and C together started and worked for x days. After x days, B left the work and A joined C and both completed the remaining work in (x+8)(x + 8) days. If the ratio of the work done by (B+C)(B + C) together to the work done by (A+C)(A + C) together is 9:119 : 11, then what fraction of the same work can be completed by C alone in 3.5x3.5x days?
Show answer without attempting

Answer: C — 710\frac{7}{10}

Open question page

Q.68

25 Jul 2023 Shift 3
A is 50% more efficient then B. B worked to finish the same work in 20 days. If A and B worked together, then how much time will they take to finish the same work?
Show answer without attempting

Answer: C — 8 days

Open question page

Q.69

25 Jul 2023 Shift 3
2 men can finish a work in 6 days and 3 women can finish the same work in 4 days. In how many days will the work be finished by 1 man and 2 women, working together every day?
Show answer without attempting

Answer: A — 4

Open question page

Q.70

25 Jul 2023 Shift 3
A can complete a piece of work in 14 days, while A and B together can complete it in 3123\frac{1}{2} days. How long will B alone take to complete it?
Show answer without attempting

Answer: D — 143\frac{14}{3} days

Open question page

Q.71

25 Jul 2023 Shift 4
A group of college students had decided to complete a project in 10 days. As 2 students dropped out every day, the project got completed at the end of the 15th day. The number of students at the beginning of the project was:
Show answer without attempting

Answer: A — 42

Open question page

Q.72

25 Jul 2023 Shift 4
4 men, working together, can finish a work in 18 days. How many more men are required to finish the same work in 12 days?
Show answer without attempting

Answer: C — 2

Open question page

Q.73

25 Jul 2023 Shift 4
20 women and 15 men together can complete a work in 6 days. It takes 150 days for a single woman to complete the work. In how many days can a single man complete the work?
Show answer without attempting

Answer: A — 450

Open question page

Q.74

21 Jul 2023 Shift 1
If A and B together can do a piece of work in 20 days, and A alone can do the same work in 30 days, then in how many days can B alone complete the same work?
Show answer without attempting

Answer: C — 60

Open question page

Q.75

21 Jul 2023 Shift 1
A worker completes 35\frac{3}{5} of a work in 12 days. In how many days will he complete 34\frac{3}{4} of the work?
Show answer without attempting

Answer: D — 15

Open question page

Q.76

21 Jul 2023 Shift 1
A works 3.5 times as fast as B, and A takes 45 days less than B to complete a job when each works alone. Calculate the number of days taken to complete the same job if A and B work together.
Show answer without attempting

Answer: D — 14

Open question page

Q.77

21 Jul 2023 Shift 2
A works 5.4 times as fast as B, and A takes 22 days less than B to complete the job when each works alone. Calculate the number of days taken to complete the same job if A and B work together.
Show answer without attempting

Answer: C — 47324\frac{7}{32}

Open question page

Q.78

21 Jul 2023 Shift 2
Amit can complete a piece of work in 5 hours; Jeevan and Paul together can complete it in 4 hours, while Amit and Paul together can complete it in 3 hours. Approximately, how many hours will Jeevan alone take to complete the work (rounded off to the nearest integer)?
Show answer without attempting

Answer: C — 9

Open question page

Q.79

21 Jul 2023 Shift 3
Rekha alone can complete a work in 16 days, and Bina alone can complete the same work in 12 days. Starting with Rekha, they work on alternate days. The total work will be completed in:
Show answer without attempting

Answer: D — 1334 days13\frac{3}{4} \text{ days}

Open question page

Q.80

21 Jul 2023 Shift 3
A can do 20% of a work in 4 days, and B can do 3313%33\frac{1}{3}\% of the same work in 10 days. They worked together for 9 days and then C completed the remaining work in 6 days. B and C together will complete 75% of the same work in:
Show answer without attempting

Answer: D — 10 days

Open question page