Filter by year

Time & Work questions

Q.41

27 Jul 2023 Shift 2
P, Q and R can complete a piece of work in 9, 12 and 18 days, respectively. Working together, how much work can they complete in one day?
Show answer without attempting

Answer: D — 14\frac{1}{4}

Open question page

Q.42

27 Jul 2023 Shift 2
Ram and Ramesh can do a work in 12 days, Ramesh and Somesh in 15 days and Somesh and Ram in 10 days. If Ram, Ramesh and Somesh work together, in how many days will they complete the work?
Show answer without attempting

Answer: B — 8

Open question page

Q.43

27 Jul 2023 Shift 2
A, B and C can do a piece of work in 20, 30 and 60 days, respectively. In how many days can A do the work if he is assisted by both B and C on every third day?
Show answer without attempting

Answer: B — 15

Open question page

Q.44

27 Jul 2023 Shift 2
Benny can do a piece of work in 24 days. Chethan and David can do the same work individually in 36 and 48 days, respectively. All of them begin the work together. However, Benny leaves the work 4 days before the completion of work and Chethan leaves the work 10 days before the completion of the work. David worked till the end and completed the work. Find the number of days in which the work was completed.
Show answer without attempting

Answer: A — 16

Open question page

Q.45

27 Jul 2023 Shift 3
Sara can finish a work in 18 days and Tara can complete the same work in 15 days. Tara worked for 10 days and left the job. In how many days can Sara finish the remaining work alone?
Show answer without attempting

Answer: A — 6

Open question page

Q.46

27 Jul 2023 Shift 3
40 men can complete a work in 30 days. However, if 10 men leave the group, how many days will the group take to complete the work?
Show answer without attempting

Answer: A — 40

Open question page

Q.47

27 Jul 2023 Shift 3
A can finish a job in 8 hours and B can finish the same job in 12 hours independently. If they work simultaneously, in how many hours can they do the same job?
Show answer without attempting

Answer: A — 4.8

Open question page

Q.48

27 Jul 2023 Shift 3
Ram can complete a piece work in 15 days, Rohan in 25 days, and Rohit in 30 days. Rohan and Rohit worked together for 2 days and then Rohit was replaced by Ram. In how many days altogether was the work completed?
Show answer without attempting

Answer: A — 10 days

Open question page

Q.49

26 Jul 2023 Shift 1
4 men’s work is equal to 6 women’s work, and 4 women’s work is equal to 6 boys’ work. A boy can finish the work in 60 days. In how many days can the work be finished by a man and a woman together?
Show answer without attempting

Answer: A — 16

Open question page

Q.50

26 Jul 2023 Shift 1
A group of men decided to do a job in 11 days but 16 men left the work after each day. The work, as a result, got completed in 15 days. How many men were there initially in the group?
Show answer without attempting

Answer: C — 420

Open question page

Q.51

26 Jul 2023 Shift 2
Pipe A and pipe B running together can fill a cistern in 6 minutes. If B takes 5 minutes more than A to fill it, then the time in which A and B will fill that cistern separately will be, respectively, _____________.
Show answer without attempting

Answer: D — 10 min and 15 min

Open question page

Q.52

26 Jul 2023 Shift 2
Pipe A can fill 50% of the tank in 6 hours and pipe B can completely fill the same tank in 18 hours. If both the pipes are opened at the same time, in how much time (in minutes) will the empty tank be completely filled?
Show answer without attempting

Answer: C — 432

Open question page

Q.53

26 Jul 2023 Shift 2
A can complete a piece of work alone in 120 days, while A and B, working together, can complete this piece of work in 72 days. In how many days can B, working alone, complete this piece of work?
Show answer without attempting

Answer: A — 180

Open question page

Q.54

26 Jul 2023 Shift 2
Each inlet pipe can fill an empty cistern in 84 hours while each drain pipe can empty the same cistern from a filled condition in 105 hours. When the cistern is empty, 9 inlet pipes and 10 outlet pipes are simultaneously opened. After how many hours will the cistern be completely filled?
Show answer without attempting

Answer: A — 84

Open question page

Q.55

26 Jul 2023 Shift 3
10 women take 16 days to complete a work which can be completed by 6 men in 8 days. 12 men started working and after 2 days 6 men left, and 5 women joined them. In how many days will the work be completed?
Show answer without attempting

Answer: D — 26/5

Open question page

Q.56

26 Jul 2023 Shift 3
X , Y and Z can complete a work in 5 days, 15 days and 30 days, respectively. In how days can the work be completed if X is assisted by Y and Z together, on every second day?
Show answer without attempting

Answer: B — 4 days

Open question page

Q.57

26 Jul 2023 Shift 3
Abraham can complete a work in 9 days, while Andrew can complete the same work in 6 days. In how many days can they complete the work if they work together?
Show answer without attempting

Answer: B — 3 3/5

Open question page

Q.58

26 Jul 2023 Shift 3
A, B and C can finish a work in 15 days working alternately in the same order. The efficiency of A is the same as that of B, and the efficiency of C is equal to that of A. In how many days will the work be finished if they work alternately in the order C, A and B?
Show answer without attempting

Answer: C — 15

Open question page

Q.59

26 Jul 2023 Shift 4
15 men complete a work in 10 days. 15 women complete the same work in 12 days. If all these men and women work together, then the number of days required to complete that work is:
Show answer without attempting

Answer: A — 55115 \frac{5}{11}

Open question page

Q.60

26 Jul 2023 Shift 4
Ramesh alone can complete a work in 24 days. Ramesh and Somesh can complete it in 8 days. How long will Somesh alone take to complete the work?
Show answer without attempting

Answer: D — 12 days

Open question page

Related topics in Arithmetic

0/200 correct0 marks